Home Categories Send inquiry

200mm Static Red Green Pedestrian Traffic Light

Product Description

Housing Material: GE UV resistance PC
Working Voltage: 12/24VDC, 85-265VAC 50HZ/60HZ
Temperature: -40℃~+80℃
LED QTY: Red66(pcs),Green63(pcs)
Certifications: CE(LVD, EMC) , EN12368, ISO9001, ISO14001, IP55

Specification:

¢200 mm Luminous (cd) Assemblage Parts Emission Color LED Quantity Wavelength (nm) Visual Angle Power Consumption
Left/Right Alow
>5000cd/㎡ Red Pedestrian Red 66(pcs) 625±5 30° 30° ≤7W
>5000cd/㎡ Green Pedestrian Green 63(pcs) 505±5 30° 30° ≤5W

Packing Info:

200mm(8 inch) LED Traffic Light
Packing Size: Quantity Net Weight.(kg): Gross Weight (kg): Wrapper Volume(m3):
0.67*0.33*0.23 m 1 pcs /carton box 4.96kg 5.5KGS K=K carton 0.051

 

Project

Company Qualification

FAQ

Q: Can I have a sample order for lighting pole?

A: Yes, welcome sample order for testing and checking, mixed samples available.

Q: Do you accept OEM/ODM?

A: Yes, we 're factory with standard production lines to fulfill different requirements from our clents.

Q: What about the lead time?

A: Sample needs 3-5 days, bulk order need 1-2 weeks, if quantity more than 1000 sets 2-3 weeks.

Q: How about your MOQ limit?

A: Low MOQ ,1 pc for sample checking available.

Q: How about the delivery?

A: Usually delivery by sea, if urgent order , ship by air available.

Q: Guarantee for the products?

A: Usually 3-10 years for the lighting pole.

Q: Factory or Trade company?

A: Professional factory with 10 years;

Q: How to ship the produt and deliver time?

A: DHL UPS FedEx TNT within 3-5 days; Air transportation within 5-7 days; Sea transportation within 20-40 days.

Advantages of our traffic lights

1. Our LED traffic lights has been made a great admiration of customers by high grade product and perfect after sales service.

2. Waterproof and dustproof level: IP55

3. Product passed CE(EN12368,LVD,EMC), SGS, GB14887-2011

4. 3 years warranty

5. LED bead: high brightness, large visual angle,all the led made from Epistar,Tekcore ,etc.

6. Housing of material: Eco-friendly PC material

7. Horizontally or vertically light installation for your choice.

8. Delivery time: 4-8 workdays for sample, 5-12 days for mass production

9. Offer free training on installation